APULIA, Troia (Foggia) – The “CO2-EATING MONSTER”, a new success “Made in BFP”: the construction of the first plant in Italy that turns the surplus of energy from renewable sources into gas

Transforming the surplus of wind and solar energy produced in the Apulian “Dauni” mountains into methane: this is the goal achieved thanks to the work of BFP GROUP that managed and developed the [...]

1st OCTOBER 2018 – BFP AND ONRENEWABLES ANNOUNCE A JOINT VENTURE

The joint venture BFP On Top of Renewables S.L. will allow BFP to serve its customers in Spain and LATAM with a local presence and allow OnRenewables to accelerate its expansion. BFP and [...]

18MWp Photovoltaic Plant

BFP is fulfilling the role of technical adviser for a 18MWp Photovoltaic Plant located in Assemini, Cagliari, (IT), suppling H&S supervision and technical assistance during the construction [...]

INGRID: European Research Project, final event in Bari on 28th March 2017

Hydrogen plays its part in the renewable sector. European experts will meet in Bari today, 28th March 2017, in an international event marking the conclusion of the European research project, [...]

UNI EN ISO 9001:2008 quality certification for BFP Service S.r.l.

BFP SERVICE S.r.l. is pleased to inform that it was recently granted UNI EN ISO 9001:2008 certification issued by CERTIQUALITY, as per attached certificate number 24117, dated 15th December 2016.

INGRID High-Tech Hydrogen Plant in Troia Inaugurated

After more then one year of hard work, on 21st December, together with our partners forming part of the INGRID Consortium, the INGRID Hydrogen Pilot plant in Troia (Italy) has been inaugurated.

BFP appointed as technical advisor for acquisition by Radiant Fund

Radiant Fund successfully purchased 5.3 MWp of PV plants in operation, from Terni Energia SpA and EAM Solar ASA.

BFP appointed for the final design of 2.5 MW Diesel/1MWp PV Plant in south of Myanmar

BFP continues to consolidate its presence in Myanmar following the latest appointment by a Singapore-based client. 

BFP lands in Argentina: 300 MWp scheduled for construction

BFP was recently commissioned for the final design of a 300 MWp photovoltaic plant in Jujui, Argentina. 

BFP appointed for the final design of a 5MWp PV plant in Jandar, Siria

BFP supports Green Power Solution for the final design of a photovoltaic plant with total power 5 MWp, named Jandar in Siria. 

page 1 of 3
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Start typing and press Enter to search